top of page
rail trailaerial fall.png

SURVEYING

Align has completed land surveys all over the state of Indiana. With experience in almost every type of project setting, we are a go-to choice for developers, contractors, and businesses in need of surveying services. We can confidently say that our surveying portfolio is packed with impressive projects that have been the foundation of many major transportation and development projects throughout the decades.

DJI_20230208093549_0005_V.JPG

Steel Dynamics, Inc. Expansion

Terre Haute

This large industrial project for Steel Dynamics Inc. included a 32+ acre ALTA survey. After the construction of the new 390,000-square-foot cold steel plant was underway, Align also provided water main staking and as-builts. 

​Wabash Valley Resources

Vigo County, IN

Align performed aerial survey mapping of 72+ acres using Drone/UAV to capture 3D data imagery and conduct a topographic survey. The survey also located and annotated the size and depth of above and below-ground utilities within the survey limits. Align’s surveyors performed a topographic survey along S.R. 63 and Staunton Rd, then completed an ALTA survey of the area and developed a platted commercial subdivision.

Screenshot 2023-05-30 145612.jpg
thumbnail_20221129_095934.jpg

Borman Expressway

 La Porte, Indiana

The I-80 and I-94 Borman Expressway (AKA Flexroad) is currently one of the largest and most advanced surveys Align has recently undertaken. This topographic survey is being performed for ITS installation, and roadway design, along one of the busiest most complex, and dangerous highways in the State of Indiana. The overall length of the project is 33 linear miles, 15 miles of mainline, and 18 miles of ramps and loops. 

INDOT DMS-11-SITES

Marion County: I-65, I-74, I-64

This large and complex survey consisted of eleven miles of alignment generation with DMS site topography for ITS installation. Align also located and collected data on 4 separate ramp locations on I-465 and located utilities. Data was collected using LiDAR and GPS.

I-465 INDOT Survey Monument.jpg
Airport Runway Survey

IND-Runway 14/32 Rehabilitation

Indianapolis International Airport

Align performed a successful survey along Runway 14/32 for 11taxiways and multiple ramp areas. In total, the survey encompassed approximately 340 acres. Align's crews worked in partnership with airport operations on a daily basis, providing daily progress reports and field operation coordination. 

I-70 Ten Bridge Survey

Vigo County, IN

Align assisted INDOT with alignment generation, right-of-way location, and topographic surveying of ten bridges along 1-70 in Vigo County. The surveys were completed using LiDAR acquisition and robotic ground topographic data collection.

I69 over Big Bend Valley.jpg
IMG_2632.JPG

Terre Haute Casino Resort

Terre Haute, IN

Align provided surveying, platting, and staking for the new Terre Haute Casino Resort. Once completed the $290 million hotel/casino will feature a 122-room luxury hotel with a pool, 5 restaurants, and 6 bars. 

FWA Runway 14/32 Project

Fort Wayne International Airport, IN

Align provided supplementary topographic survey services of 300 acres at Fort Wayne International Airport in preparation for runway rehabilitation. Our services included as-built surveys, control surveys, mobile LiDAR Acquisition, and soil boring locations. Our crews located taxiways and managed communication with FWA operations throughout the project. 

thumbnail_20220927_122420.jpg
bottom of page